Description
The UVC Pro Quartz Tube 24 Watt PRO-06 is a replacement quartz sleeve designed specifically for the compatible UVC Pro PRO-06 24W UV reactor. The quartz sleeve forms a transparent protective barrier between the UV lamp and the water, allowing UV-C radiation to pass through while preventing the lamp from coming into direct contact with the water.
The quartz sleeve is an important component of the UVC Pro UV sterilisation system. A clean, intact sleeve helps maintain effective transmission of UV-C radiation from the lamp into the water-treatment chamber.
Under normal operating conditions, you generally do not need to replace the quartz sleeve routinely, and you can clean it periodically. However, you should replace it if it becomes cracked, damaged or otherwise unsuitable for continued use.
Use this replacement quartz tube for the UVC Pro PRO-06 24W UV reactor. Correct sleeve length is essential for proper sealing during installation.
O-rings are not included.
Features:
- Replacement quartz sleeve for the UVC Pro PRO-06.
- Designed for the compatible 24W UV lamp.
- Provides a transparent barrier between the UV lamp and water.
- Allows UV-C radiation to pass through the quartz.
- Prevents direct contact between the UV lamp and treated water.
- Suitable for replacing a cracked or damaged quartz sleeve.
- Clear quartz construction for UV-C transmission.
- Designed for installation inside the compatible UVC Pro PRO-06 reactor.
- Suitable for UV system maintenance and servicing.
- O-rings excluded.
- Supplied as the quartz tube only.
Specifications:
- Product type: UV quartz tube / Quartz sleeve.
- Brand: UVC Pro.
- Compatible UV reactor: PRO-06.
- Compatible UV lamp: 24W.
- Application: UV water treatment.
- Material: Quartz / quartz glass.
- Function: Protective sleeve for UV lamp.
- UV-C transmission: Yes.
- O-rings: Not included.
- Installation: Inside compatible UVC Pro PRO-06 UV reactor.
- Product supplied: Quartz tube only.
Applications:
- UVC Pro PRO-06 UV reactor servicing.
- Replacement of cracked or damaged quartz sleeves.
- 24W UVC Pro UV sterilisation systems.
- Domestic water-treatment systems.
- Point-of-entry UV water-treatment systems.
- Borehole water-treatment systems.
- Small commercial water-treatment installations.
- UV system maintenance and replacement.
Why choose the UVC Pro quartz tube 24 Watt PRO-06?
- PRO-06 compatibility: Designed specifically for the compatible UVC Pro PRO-06 24W UV reactor.
- Protects the UV lamp: Provides a physical barrier between the lamp and water.
- Allows UV-C transmission: Quartz allows UV-C radiation to pass through into the treatment chamber.
- Replacement solution: Suitable for replacing a cracked, damaged or unsuitable quartz sleeve.
- Maintenance-friendly: A clean quartz sleeve helps maintain effective UV-C transmission.
- Correct system fit: Designed for the compatible PRO-06 reactor dimensions.
- Water-treatment application: Purpose-built as a replacement component for UV water-treatment equipment.
Important compatibility information:
This quartz tube is designed for the UVC Pro PRO-06 24W UV reactor.
Before installation, confirm that the replacement sleeve matches the existing system, including:
- UVC Pro reactor model.
- UV lamp wattage.
- Quartz sleeve dimensions.
- Sleeve length.
- Seal and O-ring requirements.
- Physical installation requirements.
The correct sleeve length is particularly important. A quartz sleeve that is too short or too long may not seal correctly, potentially allowing water to enter the lamp area and cause damage to the UV system. The current product page specifically warns customers to confirm the correct quartz sleeve length before ordering.
O-rings are not included with this product.
Installation and handling:
Quartz sleeves are fragile and should be handled carefully.
- Switch off and isolate the UV system before servicing.
- Allow the system and UV lamp to cool before handling.
- Handle the quartz sleeve carefully to prevent cracking or breakage.
- Avoid touching the quartz surface unnecessarily.
- Inspect the sleeve for cracks or damage before installation.
- Ensure the appropriate O-rings and seals are correctly positioned.
- Do not overtighten retaining components.
- Check the system for leaks before returning it to operation.
Professional installation is recommended where required.









